This was the first of three projects fabricated for Syncrude.
A total of 12 - 130 cubic meter flotation machines were built.
Parked at Fort Mac waiting to move to site at night.
Trial fit of flow control actuators.
Flow control plugs and seats.
Cell #1 with Feed Box fit.
Flow control box fit to cell
Chrome Carbide overlay plate in high wear areas.
Trial fit of drive components
Wear liner complete on interior of cell
Insulated feed and discharge boxes
Bridges with drive assemblies installed